Repairs from Macomb County Sinkhole to Take Until Thanksgiving
FRASER, Mich. (AP) – It likely will take until Thanksgiving to repair damage from a broken sewer line that caused a football field-sized sinkhole on Christmas Eve north of Detroit.
Macomb County Public Works chief Candice Miller said Tuesday that the cost of the work would be determined Monday when a contract is awarded.
She previously estimated costs at more than $78 million. Miller made the remarks at a news conference to introduce two Michigan State Police robots that were then sent into three houses that had to be condemned to make a video inventory of the properties.
The robots are normally used by the bomb squad but were sent inside to ensure workers’ safety. She said the information will be used to determine a fair offer to the homeowners.
Related News
From Archive
- Glenfarne Alaska LNG targets late-2026 construction start for 807-mile pipeline project
- U.S. water reuse boom to fuel $47 billion in infrastructure spending through 2035
- $2.3 billion approved to construct 236-mile Texas-to-Gulf gas pipeline
- Major water pipe break in Puerto Rico hits over 165,000 customers
- Potomac River Tunnel project enters construction phase beneath Washington, D.C.
- Pennsylvania American Water launches interactive map to identify, replace lead water service lines
- Trump's tariffs drive $33 million cost increase for Cincinnati sewer project
- Utah city launches historic $70 million tunnel project using box jacking under active rail line
- Tulsa residents warned after sewer lines damaged by boring work
- Fatal trench collapse halts sewer construction in Massachusetts; two workers hospitalized

Comments