New Hampshire Town Appeals Order to Replace Sewer Force Mains
HAMPTON (AP) — Hampton officials are appealing a state order directing the town to replace two sewer force mains at the beach after one of the pipes leaked sewage into the town’s marsh.
The state Department of Environmental Services handed down the order last month, instructing the town to replace the force mains by Dec. 1. Construction plans must be provided by March 1.
Town Manager Fred Welch tells the Portsmouth Herald the board voted last week to appeal. The state Water Council will decide whether to hear that appeal.
The town says the pipes should be replaced, but it’s concerned the order’s terms are too demanding.
The town says it’s also concerned it will still have to replace the mains even if voters reject a $4.2 million bond article next month.
Related News
From Archive
- Tunnel boring machine ‘Clack-A-Mole’ nears one-third completion in Oregon outfall project
- Texas A&M weighs underground transit plan with Elon Musk's Boring Co. to reduce campus traffic
- Lynchburg, Va., breaks ground on largest-ever Blackwater CSO tunnel project
- Wyo-Ben’s Max Gel, Max Bore HDD system boost drilling efficiency, performance
- Federal court halts permits for 32-mile Tennessee gas pipeline project
- Wisconsin proposes new PFAS drinking water standards to align with federal rules
- Elgin, Ill., joins EPA drinking water initiative to accelerate lead pipe replacement
- Dog River pipeline replacement in Oregon improves water supply with new HDPE pipe
- Leaking wastewater systems named top source of San Diego River contamination, study finds
- New Portable Welding System From Miller
Comments