Michigan to Oversee Building of Flint Water Pipeline Section
FLINT, Mich. (AP) — The state of Michigan will oversee construction of a section of water pipeline that will connect Flint to the new Karegnondi Water Authority pipeline.The Flint Journal reports (http://bit.ly/2jsoam9 ) a memorandum of understanding was signed earlier this month by Flint Mayor Karen Weaver and Richard Baird, transformation manager for Gov. Rick Snyder. Under the agreement, $4.2 million in construction costs will be paid using state funds.
The about 2-mile-long pipeline section will installed on the city’s north side and allow Flint to bring Lake Huron water from the pipeline to the Flint water plant.
Currently, Flint gets pre-treated Great Lakes Water Authority water.
The city switched from Detroit water to the Flint River in 2014 to save money, but corrosive water caused lead to leach from aging pipes into homes.
Related News
From Archive
- Glenfarne Alaska LNG targets late-2026 construction start for 807-mile pipeline project
- U.S. water reuse boom to fuel $47 billion in infrastructure spending through 2035
- $2.3 billion approved to construct 236-mile Texas-to-Gulf gas pipeline
- Major water pipe break in Puerto Rico hits over 165,000 customers
- Potomac River Tunnel project enters construction phase beneath Washington, D.C.
- Pennsylvania American Water launches interactive map to identify, replace lead water service lines
- Trump's tariffs drive $33 million cost increase for Cincinnati sewer project
- Utah city launches historic $70 million tunnel project using box jacking under active rail line
- Tulsa residents warned after sewer lines damaged by boring work
- Fatal trench collapse halts sewer construction in Massachusetts; two workers hospitalized

Comments