New Jersey American Water Investing $2.7 Million in Infrastructure Improvements
New Jersey American Water is investing more than $2.7 million for new water mains throughout Burlington and Camden Counties. The work will be completed by December 31 and the 14,000 feet of new pipe replaces water main that was installed as far back as the early 1900s. The aging water lines will be replaced with ductile iron pipes.
“With the installation of the new water mains, New Jersey American Water customers should experience increased water flows for residences and fire protection, and continued improvement in reliability,” stated Carmen Tierno, senior director of Operations, Southwest Region. “The water main improvements are part of New Jersey American Water’s multimillion dollar program to accelerate the renewal of water infrastructure that is reaching the end of its useful life.”
Construction and street restoration will be completed in Spring 2017.
Related News
From Archive
- Texas A&M weighs underground transit plan with Elon Musk's Boring Co. to reduce campus traffic
- Lynchburg, Va., breaks ground on largest-ever Blackwater CSO tunnel project
- Wyo-Ben’s Max Gel, Max Bore HDD system boost drilling efficiency, performance
- Federal court halts permits for 32-mile Tennessee gas pipeline project
- CGA’s 2023 DIRT report shows fewer utility damages, urges action on locating delays
- Wisconsin proposes new PFAS drinking water standards to align with federal rules
- Dog River pipeline replacement in Oregon improves water supply with new HDPE pipe
- Leaking wastewater systems named top source of San Diego River contamination, study finds
- New Portable Welding System From Miller
- Excavator Causes Puerto Rico Power Outage
Comments