Arson Suspected in Latest Dakota Access Pipeline Fire
REASNOR, Iowa (AP) — Authorities suspect arson in the latest burning of heavy equipment being used in the construction of the four-state Dakota Access pipeline in central Iowa.
The Jasper County Sheriff’s Office says the blaze late Saturday near Reasnor, Iowa, caused about $2 million damage to an excavator and three bulldozers. The equipment is operated by a contractor for Dakota Access, a subsidiary of Dallas-based Energy Transfer Partners.
Opponents have for months been protesting the $3.8 billion, nearly 1,200-mile project pipeline, warning its construction could jeopardize water supply and damage cultural artifacts.
Another suspected arson of construction equipment happened on Aug. 1 at the same site, about 30 miles east of Des Moines.
No arrests have been made in either fire. The Iowa Fire Marshal Division and the FBI are investigating.
Related News
From Archive
- Tunnel boring machine ‘Clack-A-Mole’ nears one-third completion in Oregon outfall project
- Lynchburg, Va., breaks ground on largest-ever Blackwater CSO tunnel project
- Texas A&M weighs underground transit plan with Elon Musk's Boring Co. to reduce campus traffic
- Wyo-Ben’s Max Gel, Max Bore HDD system boost drilling efficiency, performance
- Federal court halts permits for 32-mile Tennessee gas pipeline project
- Wisconsin proposes new PFAS drinking water standards to align with federal rules
- Elgin, Ill., joins EPA drinking water initiative to accelerate lead pipe replacement
- Dog River pipeline replacement in Oregon improves water supply with new HDPE pipe
- Leaking wastewater systems named top source of San Diego River contamination, study finds
- New Portable Welding System From Miller
Comments