North Dakota Pipeline Construction Halted Until Court Date
BISMARCK, N.D. (AP) — Developers of a $3.8 billion, four-state oil pipeline have agreed to halt construction near an American Indian reservation in southern North Dakota until a federal court hearing next week in Washington, D.C.
The Standing Rock Sioux Tribe is suing federal regulators for approving permits for the Dakota Access Pipeline that will move oil from North Dakota to Illinois. Tribal officials filed the lawsuit last month against the U.S. Army Corps of Engineers.
The tribe argues the pipeline would affect drinking water for residents on the reservation and disturb sacred sites outside of it.
The tribe’s request for a temporary injunction hearing is slated for Wednesday.
Dallas-based Energy Transfer Partners said Thursday it will temporarily stop work near the reservation but that work continues in other parts of the state.
Related News
From Archive
- Tunnel boring machine ‘Clack-A-Mole’ nears one-third completion in Oregon outfall project
- Texas A&M weighs underground transit plan with Elon Musk's Boring Co. to reduce campus traffic
- Lynchburg, Va., breaks ground on largest-ever Blackwater CSO tunnel project
- Wyo-Ben’s Max Gel, Max Bore HDD system boost drilling efficiency, performance
- Federal court halts permits for 32-mile Tennessee gas pipeline project
- Wisconsin proposes new PFAS drinking water standards to align with federal rules
- Elgin, Ill., joins EPA drinking water initiative to accelerate lead pipe replacement
- Dog River pipeline replacement in Oregon improves water supply with new HDPE pipe
- Leaking wastewater systems named top source of San Diego River contamination, study finds
- New Portable Welding System From Miller
Comments