Court Hearing Set for Friday on Effort to Halt Oil Pipeline in Iowa
DES MOINES, Iowa (AP) — As work progresses on an oil pipeline crossing Iowa, opponents are holding protest rallies and taking the state utilities regulators to court in hopes of stopping construction.
A hearing is scheduled for Friday in Des Moines on a motion to stay construction on several parcels of land. It’s part of a lawsuit challenging the Iowa Utilities Board’s authority to give for-profit Texas oil company Dakota Access the right to condemn private farmland for the pipeline.
Company attorney Bret Dublinske says the stay is another attempt to halt the project without a legal or factual basis.
The board, meeting Tuesday, learned 60 percent of the project right-of-way is cleared, 40 percent graded and trenches are dug on about 15 percent of the needed path.
Outside the meeting two dozen opponents protested.
Related News
From Archive
- Tunnel boring machine ‘Clack-A-Mole’ nears one-third completion in Oregon outfall project
- Lynchburg, Va., breaks ground on largest-ever Blackwater CSO tunnel project
- Texas A&M weighs underground transit plan with Elon Musk's Boring Co. to reduce campus traffic
- Wyo-Ben’s Max Gel, Max Bore HDD system boost drilling efficiency, performance
- Federal court halts permits for 32-mile Tennessee gas pipeline project
- Wisconsin proposes new PFAS drinking water standards to align with federal rules
- Elgin, Ill., joins EPA drinking water initiative to accelerate lead pipe replacement
- Dog River pipeline replacement in Oregon improves water supply with new HDPE pipe
- Leaking wastewater systems named top source of San Diego River contamination, study finds
- New Portable Welding System From Miller
Comments