Bakken Pipeline Will Run Under Sacred Tribal Site in Iowa
DES MOINES, Iowa (AP) — Iowa officials will allow work on a four-state oil pipeline to go forward after the company submitted a plan to avoid disrupting an American Indian burial ground.
Department of Natural Resources spokesman Kevin Baskins tells The Des Moines Register (http://dmreg.co/28KnoyM ) that Texas-based Dakota Access LLC was given an amendment on its permit to dig at Big Sioux River Wildlife Management Area.
Instead of a trench, the pipeline will be built about 85 feet underground using special boring equipment, Baskins said.
State Archaeologist John Doershuk said the company’s plan is satisfactory, but Indigenous Environmental Network organizer Dallas Goldtooth says his group opposes the decision to allow construction to go forward.
The $3.8 billion, 1,150-mile pipeline spans four states. The Iowa section still needs permits from the U.S. Army Corps of Engineers.
Related News
From Archive
- Tunnel boring machine ‘Clack-A-Mole’ nears one-third completion in Oregon outfall project
- Lynchburg, Va., breaks ground on largest-ever Blackwater CSO tunnel project
- Texas A&M weighs underground transit plan with Elon Musk's Boring Co. to reduce campus traffic
- Wyo-Ben’s Max Gel, Max Bore HDD system boost drilling efficiency, performance
- Federal court halts permits for 32-mile Tennessee gas pipeline project
- Wisconsin proposes new PFAS drinking water standards to align with federal rules
- Elgin, Ill., joins EPA drinking water initiative to accelerate lead pipe replacement
- Dog River pipeline replacement in Oregon improves water supply with new HDPE pipe
- Leaking wastewater systems named top source of San Diego River contamination, study finds
- New Portable Welding System From Miller
Comments