Aegion Awarded $8 Million Municipal Contract from the City of Montgomery, Alabama
Aegion Corporation has received an $8 million contract from the City of Montgomery, Alabama for its Infrastructure Solutions platform. This project is the second and final phase of a wastewater pipeline rehabilitation project located in the Econchate Basin, a collection system that drains into the Econchate Wastewater Treatment Plant.
The first phase of the project, also awarded to Aegion, was completed in April 2016 and included the installation of 10,000 feet of Insituform® CIPP and iPlus® Composite in 48-inch to 54-inch diameter pipelines. This second phase is expected to take 15 months to complete with work likely to begin later this month.
Company crews will install Insituform® CIPP and iPlus® Composite to rehabilitate over 20,000 feet of 8-inch to 48-inch diameter pipelines. The project also involves managing the rehabilitation of 34 manholes and the construction of over two miles of all-weather access road in the wetland area.
Related News
From Archive
- Tunnel boring machine ‘Clack-A-Mole’ nears one-third completion in Oregon outfall project
- Texas A&M weighs underground transit plan with Elon Musk's Boring Co. to reduce campus traffic
- Lynchburg, Va., breaks ground on largest-ever Blackwater CSO tunnel project
- Wyo-Ben’s Max Gel, Max Bore HDD system boost drilling efficiency, performance
- Federal court halts permits for 32-mile Tennessee gas pipeline project
- Wisconsin proposes new PFAS drinking water standards to align with federal rules
- Elgin, Ill., joins EPA drinking water initiative to accelerate lead pipe replacement
- Dog River pipeline replacement in Oregon improves water supply with new HDPE pipe
- Leaking wastewater systems named top source of San Diego River contamination, study finds
- New Portable Welding System From Miller
Comments