February 2016, Vol. 71 No. 2

Features

RehabZone Demos at UCT

We have a FANTASTIC line up of RehabZone demos this year. If you are in the Atlanta area, Check out the schedule below then visit the UCT exhibit hall for FREE! Use code HALL16. RehabZone demonstrations will be held at the Georgia World Congress Center in downtown Atlanta.

Register for FREE in three quick steps:

  1. Click here
  2. Then, select the “promotion code” option and enter HALL16 (you must click promotion code for the code to work)
  3. Follow the prompts and you’re done!

Wednesday, Feb. 3

1:30pm 2:15pm
Open Discussion: Current and Future Technologies

Imagine all of the industry experts are in one place. This is an open forum of Professionals from all walks of the industry from Rehabilitation, Inspections, PACP and Pipelining to Bypass Pumping and Pipe Cleaning. You name it we will have the people there to answer your questions in a NON-BIASED way. This is a can’t-miss session at the RehabZone!!!

2:30pm 3:30pm
LMK Technologies

With today’s current available options for lining main-to-lateral connections utilizing more than one type of technology, how do you know which installation technique is preferred?
Best practices for lining laterals without an outside cleanout.
Common lateral lining misconceptions.

3:45pm 4:45pm
Raven Lining Systems

Manhole rehabilitation using an epoxy coating system from proper substrate preparation through completed application.

4:45pm 6:00pm
Raven Lining Systems

Hands on demonstration of QA/QC test methods for holiday detection and adhesion of coatings.

Thursday, Feb. 4

12:00pm – 1:00pm
ADS

This demonstration will show the speed, versatility and performance of a compression–fit, lateral connection. We will demonstrate a tap into PVC and triple wall polypropylene pipe, using the standard set of tools required to make these connections. With these fittings, you can connect any type of lateral pipe to any type of mainline and attain a sanitary grade fit. These products meet all of the ASTM lab and field test requirements of a watertight, air-testable connection.

1:00pm 1:30pm
RapidView

  • Enhanced lateral inspections
  • Cross bore inspections
  • Future enhancements in launching and
  • mapping

1:30pm 2:15pm
Avanti

Use of chemical grouting to STOP infiltration and reduce strain on your treatment facility.

2:15pm 3:00pm
Reline America

UV CIPP

3:00pm 4:00pm
Envirosight – Pipeline Renewal Technologies

Overview of a steerable jet camera

4:00pm 5:00pm
Perma-Liner Industries

Perma-Liner will demonstrate two solutions for the rehabilitation of main sewer lines – Sectional Point Repair and Continuous Lining from Manhole to Manhole.

5:00pm 6:00pm
Tric Tools 60

Lateral Pipe Bursting: Hands-on pipebursting. Environmental impact and municipal regulations surrounding sewer lateral compliance.

From Archive

Comments

{{ error }}
{{ comment.comment.Name }} • {{ comment.timeAgo }}
{{ comment.comment.Text }}