<?xml version="1.0" encoding="UTF-8" ?>
<rss version="2.0">
    <channel>
        <title>ucononline.com RSS </title>
        <link>https://ucononline.com</link>
        <description>Underground Construction</description>

            <item>
                <title><![CDATA[ D.C. cuts pipeline replacement plan, orders gas system investigation ]]></title>
                <link>https://undergroundinfrastructure.com/news/2026/march/dc-cuts-pipeline-replacement-plan-orders-gas-system-investigation</link>
                <description>
                    <![CDATA[
                    The D.C. Public Service Commission has reduced Washington Gas Light’s pipeline replacement budget to $150 million while opening an investigation into long-term natural gas distribution system planning.
                    ]]>
                </description>
            </item>
            <item>
                <title><![CDATA[ Washington Watch: Will Senate remove infrastructure roadblocks? ]]></title>
                <link>https://undergroundinfrastructure.com/magazine/2026/february-2026-vol-81-no-2/features/washington-watch-will-senate-remove-infrastructure-roadblocks</link>
                <description>
                    <![CDATA[
                    Two House-passed permitting reform bills targeting NEPA reviews and Clean Water Act pipeline approvals now face a pivotal test in the Senate, where bipartisan negotiations could determine the future of federal infrastructure and energy project timelines.
                    ]]>
                </description>
            </item>
            <item>
                <title><![CDATA[ Senate approves 40-mile Southern Nevada water pipeline beneath Sloan Canyon ]]></title>
                <link>https://undergroundinfrastructure.com/news/2026/february/senate-approves-40-mile-southern-nevada-water-pipeline-beneath-sloan-canyon</link>
                <description>
                    <![CDATA[
                    The U.S. Senate has approved legislation authorizing a 40-mile Southern Nevada water pipeline beneath Sloan Canyon, a project aimed at improving water reliability for Henderson and the Las Vegas Valley.
                    ]]>
                </description>
            </item>
            <item>
                <title><![CDATA[ Malibu advances $125-million sewer pipeline project to support post-fire rebuilding ]]></title>
                <link>https://undergroundinfrastructure.com/news/2026/february/malibu-advances-125-million-sewer-pipeline-project-to-support-post-fire-rebuilding</link>
                <description>
                    <![CDATA[
                    Malibu officials are advancing a proposed $125-million sewer collection system and pipeline project to support rebuilding of fire-damaged coastal properties, with a two-step property owner vote planned to fund design and construction.
                    ]]>
                </description>
            </item>
            <item>
                <title><![CDATA[ Comprehensive microtrenching FAQ: Key insights on the Vermeer MTR516 microtrencher ]]></title>
                <link>https://undergroundinfrastructure.com/magazine/2026/february-2026-vol-81-no-2/special-focus/comprehensive-microtrenching-faq-key-insights-on-the-vermeer-mtr516-microtrencher</link>
                <description>
                    <![CDATA[
                    Learn how the Vermeer MTR516 microtrencher supports faster, cleaner fiber installation with deeper cuts, improved spoil control and enhanced jobsite efficiency through microtrenching.
                    ]]>
                </description>
            </item>
            <item>
                <title><![CDATA[ $175-million desalination and pipeline project approved to boost Corpus Christi water supply ]]></title>
                <link>https://undergroundinfrastructure.com/news/2026/february/175-million-desalination-and-pipeline-project-approved-to-boost-corpus-christi-water-supply</link>
                <description>
                    <![CDATA[
                    Corpus Christi officials have approved contracts and funding to advance a $175-million brackish water desalination plant and pipeline conveyance system designed to expand water supply and strengthen long-term infrastructure resilience in South Texas.
                    ]]>
                </description>
            </item>
            <item>
                <title><![CDATA[ Portland advances Bull Run raw water tunnel and pipeline construction ]]></title>
                <link>https://undergroundinfrastructure.com/news/2026/february/portland-advances-bull-run-raw-water-tunnel-and-pipeline-construction</link>
                <description>
                    <![CDATA[
                    Portland’s Bull Run Filtration Project is advancing with tunnel excavation and more than 6,000 feet of new underground pipeline installed as the city works toward a 2027 regulatory compliance deadline.
                    ]]>
                </description>
            </item>
            <item>
                <title><![CDATA[ Cadiz Mojave groundwater pipeline project advances toward $194-million WIFIA loan ]]></title>
                <link>https://undergroundinfrastructure.com/news/2026/february/cadiz-mojave-groundwater-pipeline-project-advances-toward-194-million-wifia-loan</link>
                <description>
                    <![CDATA[
                    The EPA has invited Cadiz’s Mojave Groundwater Bank Northern Pipeline project to apply for up to $194 million in WIFIA financing, advancing funding plans for a major California water supply and pipeline infrastructure development.
                    ]]>
                </description>
            </item>
            <item>
                <title><![CDATA[ RIDGID marks 30 years of pipeline inspection and utility diagnostic technology ]]></title>
                <link>https://undergroundinfrastructure.com/news/2026/february/ridgid-marks-30-years-of-pipeline-inspection-and-utility-diagnostic-technology</link>
                <description>
                    <![CDATA[
                    RIDGID is marking 30 years of diagnostic innovation, highlighting advances in pipeline inspection cameras, locating tools and connected technologies that continue to shape how underground utilities are inspected, maintained and rehabilitated.
                    ]]>
                </description>
            </item>
            <item>
                <title><![CDATA[ SCWA sues Riverhead over $35 million North Fork water pipeline project ]]></title>
                <link>https://undergroundinfrastructure.com/news/2026/february/scwa-sues-riverhead-over-35-million-north-fork-water-pipeline-project</link>
                <description>
                    <![CDATA[
                    The Suffolk County Water Authority has filed suit against Riverhead over zoning authority tied to its North Fork Water Main Project, a 12-mile pipeline aimed at improving regional water reliability.
                    ]]>
                </description>
            </item>
    </channel>
</rss>
